Logan North Aquatic Centre

Public Toilet Facility at Logan North Aquatic Centre

Logan North Aquatic Center were in need of a larger toilet facility near the swimming pools that was large, included showers, was accessible & fully compliant and aesthetically pleasing.

Client:
Logan North Aquatic Center, Box & Co, Logan City Council
Product/s:
Whitehaven
Year:
2024

Logan North Aquatic Center were in need of a larger toilet facility near the swimming pools that was large, included showers, was accessible & fully compliant and aesthetically pleasing. We worked on this project with construction company Box & Co, collaborating together to deliver a toilet building that spoke to the needs of council and aquatic center and matched the aesthetics of the playground and pool.

Challenges

  • Accessibility – fully functional for people with disabilities and compliant
  • A large toilet building that could hold showers, change rooms, drink fountains & a storeroom
  • Vandal resistant & durable – how to prevent vandalism and ensure longevity
  • Aesthetics – aesthetically pleasing building that matched pool and playground

Solution

Accessibility

  • Building included universal access cubicles compliant with AS 1428.1
  • Included Changing Places cubicle - Ensures safe, comfortable restroom use for all, featuring an adult-sized changing table, toilet, ceiling hoist, space for two assistants, optional shower, and various mobility cubicles

The right building type

  • Offered our Whitehaven building which featured two service areas, a storage room, privacy screens, 5 accessible toilets & Changing Places facility and 5 showers, perfect for pool area

Vandalism

  • Mini-orb sheeting was selected for the internal walls - strong ribbed profile is both highly impact resistant and deters graffiti.
  • The doors were also fitted with auto-locking, which prevents access late at night
  • The modular pre-fab system means if a panel does sustain damage it can be quickly and cost effectively replaced.

Durability

  • Strong hot dip galvanised aluminium and stainless steel fixtures and fittings were used throughout to last many years into the future & prevent continual maintenance

An Outstanding Result

  • Beautiful toilet building that matched aquatic centre’s environment
  • Lot’s a positive feedback from the pool users & staff since the install
  • A clean, private, durable building that will be used in the Aquatic Centre for many years to come

Want to Build Something Similar? Get the Costs & Specs

Get a full breakdown of costs, specs, and materials – just fill in your details, and we’ll be in touch ASAP.

View Inspiration Lookbook

Logan North Aquatic Centre

View and Download Lookbook

View and Download Lookbook

Articles

Logan North Aquatic Centre

How to Plan, Design & DeliverYour Public Toilet Project

How to Plan, Design & DeliverYour Public Toilet Project
Logan North Aquatic Centre

How to Maximise Changing Places Funding for Your Council in 2025

How to Maximise Changing Places Funding for Your Council in 2025

Have a project to do?

Planning a toilet building project is complex but we’re here to help. Reach out or start your project consultation today.